MCW were asked to produce a control system for 75kW slip ring fed, wound rotor induction motor that was being used to drive a steel rolling mill via a Radicon gearbox. At the heart of the system MCW used the Fairford Synergy intelligent soft starter to provide a...
BRE, based in Watford near London, UK operates the largest ‘burn hall’ in Europe. The burn hall is used to carry out flammability testing on various domestic, commercial and industrial products. BRE previously used three 185kW two-speed AC induction motors controlled...
The engineers at MCW were asked to design and build a range of control panels to keep a constant pressure level in a set of two power washer pumps. The two pumps were controlled using the Invertek Drives, Optidrive ECO inverters with “optiflow software”,...